Marine Research Pier | Marine Research Pier | University of New Hampshire

Marine Research Pier | University of New Hampshire
Marine Research Pier | University of New Hampshire
Lead Organisation University of New Hampshire
Country USA
Type Tidal,Wave,Offshore Wind
Website https://marine.unh.edu/research-centers/facilities/judd-gregg-marine-research-complex
  • Type of Testing Tidal,Wave,Offshore Wind
    Year Established
    Temperate/Tropical
    Commercial/Array/Full scale/Scale Scale
    Development Status Operational

    Overview

    The UNH Marine Research Pier is located across from the Coast Guard Station on New Castle, NH, to the East of Portsmouth, NH. It measures 325’ x 28’ (re-built in 2008), has cranes/forklift, power, internet and serves as a staging point for both the offshore and estuarine operations.

    Bays under the pier are also used for materials testing for MHK (Corrosion, Bio-fouling). The research vessels R/V Gulf Challenger, R/V Coastal Surveyor, R/V Cocheco, R/V Galen J and R/V Ferdinand Hassler are berthed here.

  • Number of Berths
    Water Depth
    Min Water Depth (m)
    Max Water Depth (m)
    Avg Water Depth (m)
    Annual mean significant wave height
    Maximum recorded wave height
    Mean (averaged current speed)
    Maximum current speed
    Maximum tidal range
    Mean wind speed
    Max wind speed
    Seabed type
    Total test area (km2)
    Distance to land
    Grid connected
    Grid connection capacity
    Rated export capacity and connection
    Proximity to nearest harbour (km)